Quick answer: Under Texas Property Code section 53.101, an owner must generally reserve 10 percent of the contract price during the work and for 30 days after completion, which directly affects how a Texas construction loan is drawn and when the final payments flow. Builders in Houston, Austin and Dallas–Fort Worth should plan their draw schedule, working capital and takeout timing around that reserve from day one.
Key takeaways
- The Texas statutory retainage rule requires an owner to reserve 10 percent of the contract price, or of the value of the work, for 30 days after the work is completed (reference 1).
- That reserve ties up cash at the end of the project, exactly when interest is running and the takeout or sale is pending.
- A construction loan budget should map draws, retainage and lien waivers into one schedule so the lender, contractor and title company are aligned.
- Planning the takeout or sale around the retainage window avoids late-stage cash crunches on spec and townhome builds.
What is statutory retainage in Texas?
Retainage is money withheld from a contractor until the project is finished and the lien risk is cleared. In Texas, Property Code section 53.101 (reference 1) provides that during the progress of work under an original contract for which a mechanic’s lien may be claimed, and for 30 days after the work is completed, the owner shall reserve either 10 percent of the contract price or 10 percent of the value of the work, measured by the proportion that the work done bears to the work to be done. The statute treats the owner as including the owner’s agent, trustee or receiver.
This is not a lender rule. It is statutory, and it applies regardless of what a loan agreement says. The statute is a reason to plan your cash flow carefully and to coordinate with an attorney on how the reserve interacts with your contracts. Nothing here is legal advice, and the statute may be amended, so verify the current text.
Bancaverse is a private credit platform and brokerage. We arrange construction, bridge and takeout financing with private capital partners and do not lend from our own balance sheet. We never promise approval or terms, and we do not publish pricing.
Why does retainage matter to a construction loan?
A construction loan is usually funded in draws that track completed work. Retainage is a second layer on top of that: even after a draw is approved, a portion of what the contractor is owed may be held back until the reserve period ends. If your loan budget treats retainage as a lump sum at the end, you can end up with a project that is physically complete, still accruing interest, and waiting on cash needed to release the final contractor payments.
That is a particular problem for spec homes and townhomes. A builder who has spent the construction budget cannot always cover a 30-day gap while waiting for a sale to close. Our spec home construction loan guide for builders explains how draw schedules, interest reserves and sale timing work together, and the retainage rule is one more reason to build a cushion.
How do you plan draws around the retainage reserve?
The cleanest way to plan is to build one schedule that shows every draw, every contractor payment and the retainage balance side by side. A basic Texas draw plan includes the following elements:
- A line-item budget with each trade’s contract price, so the 10 percent reserve can be calculated per contract.
- A draw schedule that distinguishes the amount paid to the contractor from the amount retained.
- Lien waivers collected with each payment, and a final unconditional waiver as the reserve is released.
- An interest reserve sized to cover the project through completion plus the 30-day period.
- A clear owner, contractor and title-company understanding of who releases retainage, when, and on what documents.
Work with a Texas construction attorney on contract language and lien procedures. Mechanic’s lien requirements involve notice and filing deadlines that vary by contract type and project, and we do not summarize them here.
How do Houston, Austin and Dallas–Fort Worth builds differ?
The retainage rule is statewide, but the building environments differ.
| Market | Typical build | Planning priority |
|---|---|---|
| Houston (Harris County) | Infill townhomes, spec single-family, small multifamily | Drainage and floodplain review, permit timing, contractor capacity |
| Austin (Travis County) | Townhomes, small infill, accessory units, mixed-use | Entitlement and permitting timeline, land basis, sale or rental exit |
| Dallas–Fort Worth (Dallas, Tarrant, Collin, Denton) | Spec homes, build-to-rent, townhome communities | Lot supply, subcontractor scheduling, takeout planning |
In Houston, flood and drainage conditions can change both the construction scope and the insurance picture, so review floodplain status and local requirements before you finalize the budget. In Austin, the permitting and entitlement process is often the critical-path item, and holding costs on land should be built into the plan. In Dallas–Fort Worth, scale and lot supply drive the economics, and build-to-rent operators should look at how the takeout will be financed. See our Texas guide on construction and takeout financing for build-to-rent in San Antonio and Fort Worth for that angle.
Planning a Texas ground-up project? Send us your budget, schedule and takeout plan and we will outline how a construction loan could be structured with retainage and draws in mind. Schedule a call or Apply.
What if you already own the land?
Many Texas builders hold lots they purchased earlier or inherited through a family business. Land you own free and clear can count toward the equity in a construction deal, which reduces the cash you need to bring to closing. Our article on construction loans when you already own the land explains how lenders typically view that contribution.
Even with land equity, retainage still applies, so you should still plan the end-of-project cash flow. Equity in land does not fund contractor payments.
How should the takeout and exit align with the retainage window?
The takeout for a construction loan can be a sale, a refinance into permanent financing or a bridge to a longer-term loan. Each exit has timing requirements that interact with the 30-day reserve period.
For a spec sale, closing within the retainage window means the buyer’s funds arrive while the reserve is still being held, which is workable only if the budget accounts for it. For a refinance, the permanent lender may require final lien waivers and a certificate of occupancy before closing, so aligning those documents with the retainage release avoids delays. For a build-to-rent project, lease-up timing and a bridge or DSCR takeout need to fit the post-completion calendar.
Where the schedule is tight, a lender partner can sometimes structure an extension option or a short bridge to cover the gap. We recommend asking about those options at the start rather than after the project is already running late.
What does a lender look for in a Texas construction file?
A strong file shows that the sponsor understands both the construction and the paperwork. Expect to provide the project budget and schedule, plans and permits or a permit timeline, the general contractor’s license information and contract, the builder’s track record, evidence of equity and liquidity, and a takeout or exit plan. Showing that you have modeled the retainage reserve and the final waiver process signals experience and reduces back-and-forth during underwriting.
For more context on how a Georgia sponsor handles spec projects, our guide to spec industrial construction loans in the Savannah port corridor offers a useful comparison of draw and takeout planning outside Texas.
Frequently asked questions
How much must a Texas owner reserve as retainage?
Under Property Code section 53.101, the owner must reserve 10 percent of the contract price, or 10 percent of the value of the work, during the progress of the work and for 30 days after completion. Confirm the current statute with counsel.
Does retainage reduce my construction loan?
No, it does not reduce the loan itself, but it changes when funds reach the contractor, which affects your cash flow, interest carry and closing timeline.
Can I release retainage early?
That is a legal question that depends on your contract and the statute. Ask your Texas construction attorney before agreeing to any early release.
Do these rules apply to a spec home I will sell?
Statutory retainage applies to original contracts for which a mechanic’s lien may be claimed. Whether a particular project is covered is a question for counsel.
How big an interest reserve should I plan?
Size it to carry the project through completion plus the retainage period and a buffer for delays. Your lender partner can help you model it.
Does Bancaverse lend directly?
No. Bancaverse arranges loans with private capital partners and does not lend from its own balance sheet or guarantee approval, pricing or terms.
Bancaverse can help you get private capital for your commercial real estate project.
References
- Texas Property Code, Section 53.101, Retainage (via FindLaw). The source notes it may not reflect the most recent version of the law; confirm against the Texas Legislature’s current text.
This article is educational, not legal, tax or investment advice. Bancaverse arranges business-purpose loans through third-party private capital partners and does not guarantee approval, terms or outcomes.